Methodology

This project consists of 10 work packages: 7 technical work packages and 3 related to management, exploitation and dissemination.

  • WP2 will be dedicated to simulate and design optimum riblet geometries and determine the optimum number of different riblet geometries and positions.
  • Design, construction, assembly and commissioning of the test rig will be carried out in WP3.
  • The aim of WP4 is the development and the application technique of the riblet material, based on the requirements of the demonstrators.
  •  WP5 will focus on the nanofunctional qualities of the material such as anticorrosion, abrasion resistance and temperature resistance.
  • In WP6 (Industrial testing), it is the linking element between the developed riblet structures of WP4 / WP5 and the following work packages WP7 / WP8.
  •  WP7 and WP8 deal with the development and industrial fabrication and assembly of demonstrators DEM1: aircraft turbofan and DEM2: industrial compressor, respectively and the actual application development, testing and validation.
  • Finally, for all administrative and general management issues a supporting WP1. Project Management is defined. Likewise, WP9. Up-scaling and Exploitation and WP10. Dissemination are defined to support the whole project with all dissemination issues, bundle the activities relates to safety assessment and most importantly will create a comprehensive and targeted roadmap for commercial exploitation of the projects results.

 

Methodology2

 

 

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of this site have already been set. To find out more about the cookies we use and how to delete them, see our privacy policy.

  I accept cookies from this site.
EU Cookie Directive Module Information